Rehabilitation of embankment on the Right bank of the Muhuri River (Length=2550m) including re-excavation/dredging of the river (Length=3900m) and bank protection works with toe protection of embankment (Length=1006m) in adjacent areas from river chainage 27.700 km to 31.600 km= 3.900 km in connection with "Rehabilitation of Muhuri-Kahua Flood Control, Drainage and Irrigation Project in Feni District (1st Phase)" under Feni WD Division, BWDB, Feni.
Tender Notice
Official tender notice details as published by the organization.